Valor gas fireplace glowing in a modern living room

Valor Fireplaces — Premium Gas & Electric Fireplace Systems

Published BTU/hr tables, listed clearances, and insert framing dimensions for builders who specify warmth the way they specify R-value and fire resistance rating—before finishes go in.

Grouped performance data

Reference BTU, vent, and clearance bands by product family

Estimators and mechanical engineers use these grouped rows when comparing Valor gas fireplaces, electric units, and inserts against chase size and fuel availability. Full filterable sheets live on the Specs page.

Gas fireplace — mid-size direct-vent
Input BTU/hr18,000 – 40,000 BTU/hr (natural gas / propane kits)
Vent typeDirect-vent coaxial, horizontal or vertical termination
Clearance to combustiblesListed mantel and side clearances per CSA / ANSI Z21.88
Fire resistance contextChase framing follows listed enclosure notes; not a rated wall assembly by itself
Electric fireplace — wall / insert formats
Heat outputUp to ~5,000 BTU/hr equivalent (1,500 W class heaters)
Power120 V dedicated or shared circuit per local electrical code
VOC emissionsNo combustion VOC; finish coatings meet low-VOC interior paint schedules
Service life expectancyLED media assemblies typically 20,000+ hour design life
Roofing interface — chase / penetration notes
Wind load rating contextTermination caps coordinated with roofing assembly wind rating (PSF / MPH)
Thermal bridgingChase insulation details to limit thermal bridging at roof/wall junctions
Moisture vapor transmissionFlashing and underlayment transitions documented for wet climates

Product families

Four Valor lines contractors shortlist first

Compact cards for rapid scanning. Open the catalog for dynamic SKUs and quote requests—no long copy wall before the grid.

Valor portrait gas fireplace

Gas Fireplaces

Direct-vent
Valor electric fireplace wall unit

Electric Fireplaces

120 V media
Valor gas fireplace insert in masonry opening

Fireplace Inserts

Retrofit
Roof chase flashing for fireplace vent

Roofing Interfaces

Chase & flashing

Why teams specify Valor

Alternating proof points for heat, install, and envelope coordination

Valor BTU test lab burn chamber

BTU tables that match the packing list

Input and output BTU/hr bands are published by fuel type so hospitality lounges and production homes stop arguing from incomplete cut sheets. When green-building premiums conflict with budget reality, we document code-compliant standard assemblies alongside optional higher-efficiency paths.

Installer checking mantel clearance on Valor fireplace

Clearances written for field crews

Mantel depths, side clearances, and hearth extensions follow listed documentation. Prefabricated chase kits versus field-built surrounds pull in different directions—vent path still decides what fits. Dimensional stability of surrounds matters when heat cycles meet millwork.

Roof penetration detailing for fireplace vent

Envelope notes for roofing trades

Vertical terminations need moisture vapor transmission and wind load rating coordination with the roofing assembly. Valor callouts help roofing crews manage thermal bridging at chase walls without inventing details on site. ASTM E108 Class A context belongs to the roofing assembly schedule; the fireplace listing alone does not create a rated roof. Since 2018, Roofing Materials interface packets have listed flashing checkpoints so freeze-thaw climates stop inventing first-winter patches.

Valor specification binder with BTU tables and clearance diagrams

Milestones behind the published tables

From 1984 field clearance matrices through 2004 insert framing sheets, 2012 electric 1,500 W media rows, and 2018–2023 roof chase packets, Valor kept one rule: publish input BTU/hr, vent type, and clearances before finishes lock. Typical mid-size gas bands stay 18,000–40,000 BTU/hr; electric paths disclose ~5,000 BTU/hr equivalent heat and 20,000+ hour LED design life. Limits stay visible—electric is not whole-room gas duty; listings do not replace wall fire resistance rating or STC schedules.

Listings & references

Certification marks used on Valor submittals

CSA / ANSI Z21.88Vented gas fireplace heaters
UL 127 / UL 907Factory-built fireplace references
ENERGY STARSelect high-efficiency gas models
ASTM E108Class A roof assembly context
Intertek / ETLElectrical fireplace listings

Send model family, fuel, and BTU target

The Valor spec desk returns cut-sheet IDs and vent notes—not a generic brochure dump. Include project city when wind or freeze conditions affect termination choices.

  • Natural gas, propane, or electric path confirmed
  • Insert framing width/height if retrofit
  • Horizontal vs vertical vent preference
  • Unit count for production or hospitality packages

Quick project inquiry